Al-Omari, Tareq.
(2004)
Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait.
PhD thesis, University of Liverpool.
Text
418590.pdf - Unspecified Download (35MB) | Preview |
Item Type: | Thesis (PhD) |
---|---|
Depositing User: | Symplectic Admin |
Date Deposited: | 20 Oct 2023 14:39 |
Last Modified: | 20 Oct 2023 14:42 |
DOI: | 10.17638/03174965 |
Copyright Statement: | Copyright © and Moral Rights for this thesis and any accompanying data (where applicable) are retained by the author and/or other copyright owners. A copy can be downloaded for personal non-commercial research or study, without prior permission or charge. |
URI: | https://livrepository.liverpool.ac.uk/id/eprint/3174965 |
Dimensions
Altmetric
Share
CORE (COnnecting REpositories)